Deliv.
No. |
Deliverable name |
Nature
|
Disse.
level |
Start Month |
Deliv.
Month |
| |
|
|
|
|
|
| Mg.1a. |
Management guide |
R |
PP |
1 |
04 |
| Mg.1b. |
Management activity memorandum |
R |
PP |
31 |
36 |
| Mg.2a. |
Dissemination activities plan |
R |
PP |
1 |
04 |
| Mg.2b. |
Dissemination activities memorandum |
R |
PU |
31 |
36 |
| Mg.3a. |
Standardization strategy document |
R |
PP |
1 |
04 |
| Mg.3b. |
Standardization activities memorandum
|
R |
PU |
31 |
36 |
| Mg.4. |
Exploitation Planning |
R |
PP |
31 |
36 |
| |
|
|
|
|
|
| Ar.1 |
SARDANA network definition |
S |
PP |
1 |
12 |
| Ar.2 |
Interoperability issues of SARDANA with
present and future access networks evolution |
R |
CO |
7 |
18 |
| Ar.3 |
Techno-economics studies. |
R |
CO |
7 |
24 |
| |
|
|
|
|
|
| Mc.1 |
Analysis of TDM-PON standards and compatibility
with the SARDANA network |
ICOM |
PP |
1 |
15 |
| Mc.2 |
Network resilience mechanisms implementation |
S, R |
PP |
1 |
18 |
| Mc.3 |
Simulation results of network traffic
and DBA performance for the SARDANA network, and longer term studies |
R |
PP |
7 |
18 |
| Mc.4 |
Multi-service delivery analysis |
R |
CO |
13 |
24 |
| Mc.5 |
MAC prototype boards for OLT and ONU/ONT. |
P |
CO |
9 |
24 |
| Mc.6 |
Control and Management Plane between
OLT and ONT/ONU plus the functions necessary for the SARDANA network.
|
S,T |
CO |
13 |
24 |
| |
|
|
|
|
|
| Tr.1 |
Study on the adopted Down/Up full-duplex
modulation formats |
S, R |
PP |
1 |
08 |
| Tr.2 |
Analysis of the noise sources and the
overall oSNR
|
S, R |
PP |
3 |
10 |
| Tr.3 |
Analysis of the system non-linear effects,
BW limitations and other impairments
|
S, R |
PP |
3 |
15 |
| Tr.4 |
Results on the power budget and pump
requirements optimization, simulation studies and experimental results
|
S, R |
CO |
13 |
18 |
| Tr.5 |
Wavelength plan specification |
S, R |
PP |
13 |
18 |
| |
|
|
|
|
|
| Sy.1.1 |
Characterization of the transmission
network and identification of the remote NODE needs/specs. |
R |
CO |
4 |
12 |
| Sy.1.2 |
Report on the remote NODE design and
test. |
R |
PP |
9 |
15 |
| Sy.2.1. |
Reflective up-stream optical modulator
design document, including benchmark analysis of ONT designs and optimization
results. |
S, R |
CO |
4 |
24 |
| Sy.2.2 |
Down-stream photo-detection module. |
R |
PP |
9 |
21 |
| Sy.2.3 |
ONT assembling (board prototype) and
test report |
P, R |
PP |
13 |
27 |
| Sy.2.4 |
Advanced longer-term ONT design studies.
|
R |
PP |
4 |
36 |
| Sy.3.1 |
Definition/specification of architecture
and components used in the OLT. |
S, R |
CO |
4 |
12 |
| Sy.3.2 |
OLT TX design and test report.
|
R |
PP |
9 |
21 |
| Sy.3.3 |
OLT RX design and test report.
|
R |
PP |
9 |
24 |
| Sy.3.4 |
OLT Optical amplification design and
test report. |
R |
PP |
9 |
21 |
| Sy.3.5 |
Pump generation design and test report.
|
R |
PP |
9 |
21 |
| Sy.3.6 |
Ring-protection protection/balance switching
design and tests document. |
S, R |
PP |
9 |
25 |
| Sy.3.7 |
OLT multiplexing, board prototypes,
assembling, verification/ validation of performance within the
proposed architecture |
R |
PP |
13 |
27 |
| |
|
|
|
|
|
| Im.1 |
Definition of network physical impairments
and identification of the required monitoring and compensating techniques |
R |
PP |
1 |
06 |
| Im.2a |
Technical description and design requirements
of monitoring and compensating schemes and development of simulation
tools |
T, R |
CO |
7 |
12 |
| Im.2b |
Simulation studies and experimental
results on the performance of individual compensating schemes |
R |
PP |
13 |
18 |
| Im.3 |
Verification/validation of network performance
and characteristics when monitors and compensators applied in the proposed
architecture |
R |
PP |
19 |
36 |
| |
|
|
|
|
|
| Dm.1 |
Demonstration Test-Bed |
P, R |
PU |
17 |
32 |
| Dm.2 |
Field Trial |
R |
PU |
31 |
36 |
| Dm.3 |
Sets of test results in 2009 and 2010
to be shared in different industry forums. |
R |
PU |
33 |
36 |
| |
|
|
|
|
|